Energy Centre for a Gold Processing Plant


18 MW

Branch of production
Mining and processing
Execution type
Modular
Stage
Finished
Services
Turnkey

In 2019, MKC Group of Companies commissioned an 18 MW modular power plant based on MWM TCG 2032B gas engines (4.5 MW). The Plant serves Svetlinskaya Gold Mill. MKC experts developed and built innovation two-storey modular units specifically for this turnkey project.

The mini-MPP for GPP «Svetlinskaya» is currently the first modular power plant in Russia based on the largest MWM engines (TCG 2032B 4,5 MW), fully designed and built by the Russian specialists – the MKC Group of Companies. The total capacity of the facility is 18 MW. The power plant consists of four modules – «giants». The height of each structure reaches 8,73 meters, length – 16,99 meters, width – 12,08 meters.

MKC Group of Companies offered an ultimate solution for the construction of two-storey modular units to provide free access to all parts of the gas genset both from the outside and from the inside. Also, MKC experts equipped the facility with MKC ventilation and heating systems thus providing a complete packaging of the largest MWM engines.

The modular power plant concept allows to assemble an object as a «construction set»: one module consists of eight small containers mounted in two floors. This facilitates the transportation and assembly of the power plant greatly, and therefore accelerates and cheapens the facility construction. The «construction footprint» of one module is 18 x 12 m. For space considerations the adjacent modules can be installed wall to wall. This combination makes the modular power plant by the ISS Group of Companies a very attractive energy solution, especially for those enterprises that need to satisfy the large demand for electric power in remote places in the shortest possible time.

Currently, the power plant supplies electric and heat power to the Russia's largest gold processing plant. One of the main advantages of a modular power plant is the possibility of phased increase of the facility to six blocks installed in a row. The power plant can increase its capacity to 27 MW if needed.

Based on experts’ estimates, the own power plant will allow the gold mining factory to reduce the electric power cost three times. Heat power, as a by-product, is free of charge. The modular power plant operates in parallel with the external network. The payback period of the facility is about 3 years.

More about the MKC modules production you can find in the «Packaging» section.

Module 4.5 MW

Module 4.5 MW

The MKS Group of Companies was the first in Russia to develop a 4,5 MW module.

Gas generator set MWM TCG 2032 V16 B

Gas generator set MWM TCG 2032 V16 B

The gas engine is the technological top of MWM — the most powerful and efficient model of this brand.

Energy Centre for a Gold Processing Plant | 18 MW
Energy Centre for a Gold Processing Plant | 18 MW
Energy Centre for a Gold Processing Plant | 18 MW
Energy Centre for a Gold Processing Plant | 18 MW
Energy Centre for a Gold Processing Plant | 18 MW
Energy Centre for a Gold Processing Plant | 18 MW