Energy Centre for a Stone Mining and Processing Plant
MKC Group of Companies put into operation a 2 MW energy centre for the natural stone mining and processing plant.
One of the main tasks of the energy centre built by the MKC Group of Companies is to provide the enterprise with stable energy supply. In 2019, a new workshop with innovative equipment was opened at the facility providing an urgent need for stable and affordable electricity supply. The management of the enterprise decided to build its own power plant. Turnkey works were taken over by the MKC Group of Companies.
The Mini-MPP was built according to the modular construction technology in a short time - the object is located on the territory of the plant, in the immediate vicinity of the consumer. The MWM generator – TCG 2020 is used as the main equipment. The energy centre operates in a cogeneration mode (simultaneous electric and heat power generation). The energy savings are significant: after the launch of the power plant the price of electricity decreased almost threefold. The payback period of the facility is about 3 years.
The corporate customer is one of the dynamically developing plants which needs continuous, reliable and affordable electricity supply. Today, the plant has five production lines and operates 24 hours a day. Its main product is high-quality white marble mineral fillers. Micro-frame fillers and marble chips are used in the production of dry building mixtures, paint coatings, linoleum, leather substitutes, cleaning agents, ceramic tiles, dishes and even paper. Products are in demand in various countries around the globe.
Module 2 MW
Compact and powerful solution with an efficient heat removal system.
Gas generator set MWM TCG 2020 V20
The optimized model is the most popular in the MWM TCG 2020 series to be used in the industrial sector.