Energy centre (stage 1) for a Mining and Processing Plant
In 2018 the MKC Group of Companies commissioned a 4 MW energy centre (stage 1 based on MWM TCG 2020 V20 gas genset engine) for Bereznyakovsky Mining and Processing Plant (UGC, JSC) in the Etkul district of the Chelyabinsk region. This facility entered the history of the Russian decentralized power supply development by the fact that it was later expanded to 8 MW, and moreover moved to another site during implementation of the second stage of the project. The energy centre transfer procedure took as little as only 8 days.
The distance between the sites was 200 meters. The decision to transfer the facility was made by the Customer – management of the Uzhuralzoloto Group of Companies, JSC, offering a more comfortable and even (laid with road plates) place for the energy object.
The possibility to rapidly move the power plant from one site to another is one of the main advantages of the modular mini-MPP construction technology, when the power object is built not in a separate fixed-site building, but in modular units. Using this technology, the mini-MPP is assembled as a constructor set as quickly as it is dismantled and, if needed, moved to another site or even transported to another city and region.
Other advantages of modular mini-MPP also include rapid assembly of the object (in 14 days), possibility of out-door installation, capacity increase simplicity (it is possible to carry out step-by-step expansion of generated capacities), as well as architectural aesthetics of the object – modular mini-MPP have modern and technological performance.
Learn more about the mini-MPP modular construction advantages in the «Power plants' construction» section.
Module 2 MW
Compact and powerful solution with an efficient heat removal system.
Gas generator set MWM TCG 2020 V20
The optimized model is the most popular in the MWM TCG 2020 series to be used in the industrial sector.