Contact us

Energy centre (stage 3) for a Mining and Processing Plant


6 MW

Branch of production
Mining and processing
Execution type
Modular
Stage
Finished
Services
Turnkey
Service maintenance

In 2018, the MKC Group of Companies has launched the third stage of the energy centre for Uzhuralzoloto Group of Companies, JSC. (Stage 1). The capacity of the power plant at the mine «Central» in Plast was increased by another 6 MW and eventually amounted to 24,4 MW.

Three 2 MW MWM TCG 2020 V20 gas genset units were used as the main generating equipment. The power plant design type is modular. This object was a clear confirmation of one of the key advantages of a modular mini-MPP: step-by-step increase of capacity depending on the customer's needs.

NB: in 7 years of cooperation the MKC Group of Companies has put into operation 6 objects for JSC «UGC» with a total capacity of 54,4 MW.

Module 2 MW

Module 2 MW

Compact and powerful solution with an efficient heat removal system.

Gas generator set MWM TCG 2020 V20

Gas generator set MWM TCG 2020 V20

The optimized model is the most popular in the MWM TCG 2020 series to be used in the industrial sector.

Energy centre (stage 3) for a Mining and Processing Plant | 6 MW
Energy centre (stage 3) for a Mining and Processing Plant | 6 MW
Energy centre (stage 3) for a Mining and Processing Plant | 6 MW
Energy centre (stage 3) for a Mining and Processing Plant | 6 MW