Energy centre for a logistics hub
In 2009, MKC Group of Companies continued its cooperation with a large retail company Tander (Magnit retail network) to build a 1.2 MW energy centre for the logistics hub.
Mini-MPP is built according to the fixed-site construction technology (in the building). 3 PETRA 500C gas genset units were used as the main generating equipment.
The mini-MPP operates in a cogeneration mode (simultaneous electric and heat power generation), thanks to which the total efficiency reached 90%, providing economic-effective fuel consumption. Natural gas is used as fuel. The energy centre operates in a parallel mode with the external network. The payback period of the facility is 3 years.
Other projects for CJSC «Tander»: