Energy centre for a logistics hub


2.6 MW

Branch of production
Trade
Execution type
Fixed-site
Stage
Finished
Services
Turnkey

In 2008, MKC Group of Companies started its cooperation with a large retail network – CJSC Tander (Magnit retail network). The first project was the energy centre with a total electric capacity of 2.6 MW.

Mini-MPP is built according to the fixed-site construction technology (in the building). 3 units of the PERKINS gas genset engines are used as the main generating equipment.

The mini-MPP operates in a cogeneration mode (simultaneous electric and heat power generation), thanks to which the total efficiency reached 90%, providing economic-efficient fuel consumption. Natural gas is used as fuel. The energy centre operates in a parallel mode with the external network. The payback period of the facility is 3 years.

In the future, the MKC Group of Companies implemented several more facilities for CJSC «Tander» in various regions of the country.

Energy centre for a logistics hub | 2.6 MW
Energy centre for a logistics hub | 2.6 MW
Energy centre for a logistics hub | 2.6 MW
Energy centre for a logistics hub | 2.6 MW
Energy centre for a logistics hub | 2.6 MW
Energy centre for a logistics hub | 2.6 MW
Energy centre for a logistics hub | 2.6 MW
Energy centre for a logistics hub | 2.6 MW
Energy centre for a logistics hub | 2.6 MW
Energy centre for a logistics hub | 2.6 MW
Energy centre for a logistics hub | 2.6 MW
Energy centre for a logistics hub | 2.6 MW